ABSCO, air and water balancing

ABSCO is a Saudi specialist in testing, adjusting and balancing HVAC systems and commissioning MEP systems to NEBB standards, for hospitals, hotels and giga-projects since 2011.

  • NEBB certified firm
  • ISO 9001 · 14001 · 45001
  • Riyadh and Makkah

Balance the air yourself

Move the dampers until all three outlets sit within ±10% of design. or drag an airstream up and down

Nearest the fan

195 / 120 L/s

+63% high

Damper 100%

Middle of the run

126 / 120 L/s

Within tolerance

Damper 100%

End of the run

85 / 120 L/s

-29% low

Damper 100%

Not balanced yet. Close the damper that gets too much air.

Fan total: 405 L/s

Clients and partners who trusted us

Government bodies, hospitals, developers and consultants whose projects we have worked on.

  • Saudi Binladin Group
  • Ministry of Commerce
  • Ministry of Defense
  • Ministry of Interior
  • Ministry of Health
  • Khatib & Alami
  • King Faisal Specialist Hospital
  • Fairmont
  • KAFD
  • STC
  • Latifia
  • Zuhair Fayez Partnership
  • Dubai Engineering Consultants
  • Dallah Hospital
  • SRACO
  • Arabian Gulf Maintenance & Contracting
  • Sarh Attaqnia
  • ANMAT
  • ELMAC
  • Dr Sulaiman Al Habib
  • Kling Consult
  • SAK
  • NEOM
  • Almajal Alarabi
  • Minwal
  • Almajal Alarabi Group
  • Saud Consult
  • Alkifah Contracting
  • Mawani
  • Awaref

Fifteen years on Saudi sites

From operating theatres to refineries, we measure every outlet and set it until it matches the design.

Founded
2011
Projects on record
53
Cities and regions
19
Certified TAB firm
NEBB
A building among the AlUla mountains, a Royal Commission for AlUla project
Royal Commission for AlUla, 2025.

Recently handed over

Six of the sites our teams balanced, tested and handed over in 2025 and 2026.

  • Technicians measuring a guest-room diffuser with a capture hood
    La Guérite luxury clubShura Island, Red Sea · Air and hydronic TAB, 2026
  • A technician testing an HVAC unit on a refinery stair platform
    Saudi Aramco Riyadh RefineryRiyadh · HVAC testing and performance assessment, 2026
  • A capture hood held to a diffuser in a hospital ward
    Hail General HospitalHail · TAB, indoor air quality and flushing, 2025–2026
  • Two technicians taking readings in a finished corridor
    World Cup 2034 Hosting AuthorityRiyadh · Testing and balancing, 2026
  • A blue capture hood raised to a ceiling outlet, seen from below
    Royal Commission for AlUlaAlUla · TAB, 2025
  • A technician on a ladder measuring a ceiling outlet
    NEOM Bay AirportNEOM · TAB

See our team on site

A few minutes of testing and balancing on our projects.

Three disciplines, one report

One team measures, sets and proves every system, and hands your consultant a single report to sign.

Testing, adjusting and balancing

Air and water flows set to design values at every terminal, measured with calibrated instruments to NEBB procedures.

  • Air balancingVAV, constant-volume, multi-zone and dual-duct systems
  • Hydronic balancingChilled and hot water, pumps, coils and circuit setters
  • Duct leakage testingPressure tests to the project specification
  • Flushing and chemical treatmentChilled, potable and firefighting water
  • Sound and vibrationdBA and NC levels, equipment vibration
  • Outside air and pressureFresh-air quantities and room pressure regimes

MEP commissioning

Proof that every system is installed to the contract documents and runs the way its designers intended.

  • Mechanical T&CHVAC, refrigeration, plumbing, drainage and BMS
  • Electrical T&CTransformers, generators, UPS, switchgear and earthing
  • Low-current systemsFire alarm, CCTV, access control and public address
  • Pre-commissioningReadiness checks before systems start
  • Green-building commissioningLEED: OPR, design review, Cx plan and final report
  • O&M manualsPrepared to international standards
+−

Indoor air and critical spaces

Verified air quality and pressure where it matters most: wards, theatres, cleanrooms and labs.

  • Indoor air qualityTemperature, humidity, CO₂ and particulates
  • Hospital critical areasOperating theatres, isolation and sterile rooms
  • Cleanroom performanceAirflow, pressure and particle tests
  • Existing buildingsInstalled-performance assessment to ASHRAE 221
  • Robotic duct cleaningDuctwork inspection, cleaning and disinfection in commercial and industrial buildings

From NEOM to Al Ahsa

Every dot is a city where our teams have worked. Select one to see its projects.

Our projects in Riyadh 21 projects

ABSCO office

Banoon IVF Hospital
Banoon IVF Hospital, 2026
  • Banoon IVF HospitalTAB, indoor air quality · 2026
  • Dr Sulaiman Al Habib Medical Center, North RiyadhTAB
  • Care Medical HospitalTAB
  • Prince Sultan Military Medical City
  • Dallah Hospital Extension
  • Dallah Hospital Namar
  • Olayan Hospital
  • Fairmont Ramla Tower
  • Novotel
  • Park Inn, Olaya
  • World Cup 2034 Hosting AuthorityTesting and balancing · 2026
  • Office of Executive Affairs
  • Diriyah Gate Experience Center
  • Artal International School2021
  • Saudi Aramco Riyadh RefineryHVAC testing and performance assessment, ASHRAE 221 · 2026
  • Premier Food Factory, AlmaraiTAB · 2025
  • STC building, Al Mursalat
  • STC buildingAir TAB
  • SAMASCO TowerHVAC balancing
  • Zamil Tower
  • IKEAAir TAB
All projects by sector 53

Healthcare

  • Hail General Hospital, 300 bedsHail
  • Banoon IVF HospitalRiyadh
  • Dr Sulaiman Al Habib Medical Center, North RiyadhRiyadh
  • Sehat Al-Kharj Hospital, Dr Sulaiman Al HabibAl Kharj
  • Dr Soliman Fakeeh Hospital
  • Care Medical HospitalRiyadh
  • Prince Sultan Military Medical CityRiyadh
  • Security Forces Medical Center
  • Sultan Military HospitalMadinah
  • Meeqat Hospital, 300 bedsMadinah
  • Prince Mansour Military HospitalTaif
  • King Fahad Specialist HospitalDammam
  • Dallah Hospital ExtensionRiyadh
  • Dallah Hospital NamarRiyadh
  • Al-Habib Hospital, West JeddahJeddah
  • Olayan HospitalRiyadh

Hospitality

  • La Guérite luxury club, Shura IslandRed Sea
  • Fairmont Ramla TowerRiyadh
  • NovotelRiyadh
  • Park Inn, OlayaRiyadh
  • CitadinesAbha
  • KAUST HotelThuwal
  • Al Darah Hotel

Government and education

  • World Cup 2034 Hosting AuthorityRiyadh
  • Ministry of JusticeAlUla
  • Royal Commission for AlUlaAlUla
  • Islamic Arts Biennale, Hajj TerminalJeddah
  • General Court of AuditAl Baha
  • Administrative CourtJeddah
  • Office of Executive AffairsRiyadh
  • High Commission for Industrial Security
  • Diriyah Gate Experience CenterRiyadh
  • Al-Safiyah Park and MuseumMadinah
  • King Khalid UniversityAbha
  • Al-Jouf UniversityAl Jouf
  • College of Pharmacy, University of TabukTabuk
  • Artal International SchoolRiyadh

Energy and industry

  • Saudi Aramco Riyadh RefineryRiyadh
  • Premier Food Factory, AlmaraiRiyadh
  • NEOM Bay AirportNEOM
  • NEOM Green HydrogenNEOM
  • Salwa border crossing, oil and gas sectorSalwa
  • Saudi Ports AuthorityYanbu
  • Red Sea projectsRed Sea

Commercial

  • STC building, Al MursalatRiyadh
  • STC buildingDiriyah
  • STC building, Madinah AirportMadinah
  • SAMASCO TowerRiyadh
  • Zamil TowerRiyadh
  • NCBAl Khobar
  • IKEARiyadh
  • Al-Amer MallAl Ahsa
  • LuLu HypermarketQassim

From first check to signed report

How a TAB and commissioning scope runs on site.

  1. A technician on a ladder inspecting ductwork above an open ceiling

    Pre-check before the ceilings close

    We walk the installation against the drawings: dampers reachable, test points fitted, coils and valves where they should be. A problem found now costs hours, not weeks.

  2. A technician reading a manometer connected to chilled-water pipework

    Measure and set every terminal

    Capture hoods, manometers and flow meters, all calibrated. Each outlet and water circuit is measured, adjusted and measured again until it sits within tolerance.

  3. A technician testing an electrical control panel

    Functional and electrical tests

    Sequences, controls, interlocks and electrical systems are tested under real operating conditions, with the contractor and consultant on site.

  4. A capture hood on a table next to marked-up drawings and test sheets

    Report, witness, hand over

    A NEBB-format report with design and measured values side by side, instrument calibration certificates and a closed deficiency list. Our NEBB Certified Professional audits field work on site, unannounced.

Standards you can defend

Results only help at handover if the consultant can trust them. Ours follow published procedures, recorded on instruments with current calibration certificates.

NEBB
Certified firm for testing, adjusting and balancing, with a NEBB Certified Professional and certified technicians on the team.
ASHRAE
Field methods to ASHRAE 111, healthcare ventilation to ASHRAE 170, commissioning to ASHRAE 202, installed performance to ASHRAE 221.
ISO 9001, 14001, 45001
Quality, environmental, and occupational health and safety management systems.
Approved on projects by consultants including Khatib & Alami, Edarat, Consolidated Consultants and Zuhair Fayez Partnership.
ABSCO engineers and technicians reviewing drawings together on site in AlUla
Our team on site for the Royal Commission for AlUla, 2025.

The people behind every report

Air Conditioning Balancing Services Co. (ABSCO) was founded in 2011. From offices in Riyadh and Makkah, our engineers and certified technicians work on sites from NEOM to Al Ahsa.

  • Dr Rayan Abdullah Al-RaddadiChief Executive Officer
  • Eng. Naseer Ahmad DarOperations and Projects Manager, NEBB Certified Professional
  • Islam IbrahimFinancial Manager
  • Moaaz AbdalkareemHuman Resources and Administration
  • Eng. TahseenHVAC Commissioning Engineer
  • Eng. YousefTAB and Commissioning Engineer

With teams of certified TAB and T&C technicians on site across the Kingdom.

Want to join us? Send your CV to info@absco.com.sa

Questions we hear on site

Something else on your mind? Ask an engineer

What is the difference between TAB and commissioning?

Testing, adjusting and balancing sets the air and water flows of HVAC systems to their design values and records them. Commissioning is wider: it verifies that each system, mechanical and electrical, is installed correctly and works as intended, through inspections and functional tests. TAB is one part of commissioning, and we deliver both.

When should a TAB firm join the project?

Before the ceilings close. A pre-check while ducts and pipes are still visible catches missing dampers and test points while they are cheap to fix. Book the balancing itself three to six months before handover.

Which standards do you work to?

NEBB procedural standards for TAB, together with ASHRAE 111, ASHRAE 170 for healthcare spaces and ASHRAE 202 for commissioning, plus the project specification.

What do we receive at the end?

A report in NEBB format with design and measured values side by side, instrument calibration certificates, a deficiency list closed out with the contractor, and witnessed results the consultant can sign. O&M manuals when they are in scope.

Do you work outside Riyadh?

Yes. We have offices in Riyadh and Makkah, and our teams have worked in NEOM, the Red Sea, AlUla, Hail, Abha, Jeddah, Madinah and Al Ahsa.

Can you test a building that is already running?

Yes. We assess installed systems against their design, for example to ASHRAE 221 at the Saudi Aramco Riyadh Refinery, and measure indoor air quality in occupied buildings.

Tell us about your project

Send the project name, location and scope, and an engineer will get back to you.

Scope

We use your details only to reply to your request. Privacy policy